Get Your Same-Day Complementary Estimates for Remodeling Today!
Stellar Kitchen & Bath Remodeling provides flooring installation and refinishing for residential properties in Denver, CO, and surrounding areas. Our services include hardwood installation, tile flooring, luxury vinyl plank (LVP), and hardwood refinishing. Each project is planned, scoped, and executed with defined timelines and clear communication.
Our team installs and refinishes multiple flooring types based on project requirements and space conditions. Services include:
Material selection is based on room function, moisture exposure, foot traffic, and subfloor condition. We follow manufacturer installation guidelines and local building codes for all flooring types.

Each flooring installation follows a defined sequence from initial assessment through final inspection. This structure ensures proper preparation, accurate material ordering, and realistic scheduling.
Initial Consultation and Property Assessment
A project manager visits the property to evaluate the existing floor, subfloor integrity, and layout. The assessment includes checking for moisture, levelness, structural concerns, and access points. We measure the space, document current conditions, and discuss material options based on how the room is used.
Material Selection and Scope Development
Clients review material samples and select flooring that fits their functional needs and design direction. We provide details on installation methods, maintenance requirements, acclimation time (for hardwood), and expected timelines. This phase also identifies any subfloor repairs, underlayment needs, or prep work required before installation.
Scope Finalization and Documentation
Before work begins, we finalize the project scope in writing. This includes square footage, material specifications, subfloor preparation, installation method, trim details, and timeline. Any coordination with cabinetry, plumbing, or electrical work is documented at this stage to avoid scheduling conflicts.
Demolition and Subfloor Preparation
We remove existing flooring and inspect the subfloor for damage, unevenness, or moisture issues. Depending on findings, we may patch, level, install underlayment, or add moisture barriers. For tile installations, we assess whether cement board or additional structural support is needed. Hardwood and LVP require a flat, stable surface with appropriate moisture levels, which we verify before proceeding.
Flooring Installation
Installation follows the material type and manufacturer specifications. Hardwood is acclimated to the indoor environment for several days before installation to prevent warping. Tile is set with proper spacing, leveling, and grout application. LVP is installed with attention to expansion gaps, locking mechanisms, and seam alignment. Throughout the process, we monitor levelness, alignment, and surface quality.
Trim Work and Final Inspection
Once the floor is installed, we install or reinstall baseboards, quarter round, transition strips, and floor vents. For hardwood refinishing, we apply stain and finish coats per the agreed schedule. After cleanup, we conduct a walkthrough with the client to review the completed work and provide care instructions specific to the installed material.
Our approach prioritizes preparation and planning before any demolition or installation begins.
We use an in-house installation team rather than rotating subcontractors. This allows us to maintain consistent installation standards, use the same techniques across projects, and provide continuity in communication. Clients work with one project manager from consultation through completion.
Subfloor preparation is treated as a required step, not an optional add-on. We do not install over compromised or uneven subfloors. If issues are found during demolition, we present options and adjust the scope before moving forward.
Material selection happens early and is locked in before installation starts. This prevents delays caused by backorders or last-minute changes and ensures that all components, including trim and transitions, are on-site when needed.
When flooring is part of a larger remodel, we coordinate sequencing with cabinetry, plumbing, and electrical trades. For example, tile installation may need to happen before vanity installation, or hardwood may be installed after drywall and paint are complete. These dependencies are mapped during scope development to avoid rework.
Timeline and Access
Flooring projects typically take three days to two weeks, depending on square footage, material type, and subfloor condition. Timelines are confirmed during planning and adjusted based on material lead times or unforeseen subfloor repairs. Clients should plan for limited access to the work area during installation. For whole-home projects, we complete work in phases to maintain usability in other parts of the house.
Budget and Scope Changes
Project budgets include material costs, labor, subfloor work, and disposal of old flooring. If additional repairs are identified during demolition, such as water damage or structural issues, we communicate the findings and provide a cost estimate before proceeding. Scope changes are documented and approved in writing.
Material Care and Maintenance
After installation, we provide care guidance specific to the flooring type. Hardwood requires periodic refinishing and humidity control to prevent gaps or warping. Tile grout may need sealing depending on the product used. LVP is low-maintenance but should be cleaned with pH-neutral products to preserve the wear layer. These details are reviewed during the final walkthrough.
Project Communication
A single project manager handles all scheduling, material coordination, and quality checks. Clients receive updates at each phase and are notified in advance of any schedule changes. We do not begin the next phase until the prior one is approved.
We work throughout Denver and nearby communities, where subfloor conditions vary based on home age, foundation type, and construction method. Colorado’s dry climate and temperature swings affect material performance, particularly for hardwood, which requires proper acclimation and ongoing humidity management.
For basement and lower-level installations, we assess moisture levels and recommend materials suited to below-grade environments. LVP and tile perform well in these spaces, while hardwood may require additional moisture mitigation or may not be recommended depending on conditions.
To begin a project, contact our office at (720) 669-9454 or email admin@skb-remodel.com. We will schedule an on-site consultation to assess the space, discuss material options, and provide a written estimate. All work is coordinated with your schedule, and we provide advance notice before each phase begins.
Due to Denver, CO, and the surrounding area’s dry climate and temperature changes, hardwood, tile, and LVP are the most reliable and long-lasting choices.
Yes. Our flooring installation service includes the complete removal and disposal of old flooring before the new installation begins.
Most projects take between 3–7 days, depending on the materials and square footage. We’ll provide a detailed timeline before work starts.
Absolutely. We specialize in seamless transitions between flooring types and color matching for a consistent flow throughout your home.
Yes. Our floor refinishing service restores the shine and durability of existing hardwood floors, saving you time and cost compared to full replacement.
Refresh your home with new floors that last. Schedule your free same-day flooring estimate with Stellar Kitchen & Bath Remodeling and start your renovation.